EV Charger Installation in Owen Sound & Grey Bruce
Panel too small for the charger? We upgrade the panel and hang the charger on the same job. Tobermory to Walkerton.
ESA licensed · WSIB covered · Owen Sound based

Does your panel have room for an EV charger?
Panel first. Then the charger.
- 01We look at the panel first. What is in it, the free spaces, and what the house already pulls.
- 02Panel can carry it. The charger gets its own circuit.Panel cannot carry it? It goes to 200 amp first, on the same job.
- 03The run to where you park. The unit mounted on the wall.
- 04Tested. And left working.
It is what the Electrical Safety Authority says to check first: the panel has to be able to handle the extra load.
EV charger work we do
Level 2 charger installation
A 240 volt circuit, the same kind of supply as a range or a dryer.
Panel upgrades for a charger
The 100 amp to 200 amp upgrade is part of the same job.
Garages, shops and cottages
A charger across the yard, fed underground by our own crew.
Tesla Wall Connector and other brands
Already bought a charger? We will fit it.
Rough-in on a new build
The wire goes in while the walls are open, and the charger goes on later.
Charger not working
If it is the circuit, the breaker or the panel, that is us.
Smell burning, or see scorching? Stop using it, then call.Fire or smoke: call 911 first.Call 519-373-2543Old fuse panel, or every space used? That is not a reason to put the charger off. The panel upgrade is part of the same job. See panel upgrades
EV charger installation, wherever you park
One crew, panel to charger.
Tom Dunne spent twelve years with Toronto Hydro before starting the company. Tyler Auger is a Master Electrician and a Power Line Technician. Bucket trucks and an excavator in the yard.
On the house
Up an outside wall, or around a finished basement.
Where you park
In the garage
On its own circuit, beside where you park.
Level 2
Garage across the yard
Fed underground. The excavator is in our yard.
Our own crew
Shop or cottage
A shop at the end of a lane, a long driveway.
A longer run
Master Electrician · Journeyman Electrician · Power Line Technician · ESA licensed contractor 7017291 · WSIB covered
What we do
EV charger and panel jobs, Grey Bruce
A charger on the wall and three panel jobs from across Grey Bruce. Our photos, no stock. Tap a photo for the crew’s own words.
A Tesla Wall Connector
On the wall, the cable coiled and strapped.
“Another Tesla charger installed and ready to power up!”
Panel, meter and a charger
Our bucket truck with the boom up at the pole.
“Great day in Dundalk, ON! 100 amp panel upgraded to a 200amp. Some meter work and a EV charger installed.”
Federal Pioneer out
A 62 circuit 200 amp panel in its place.
“200A Panel Upgrade in Owen Sound! We tossed the old Federal Pioneer panel and installed this beast of a 62-circuit 200A panel.”
Fuse panel out, breakers in
An old fuse panel that blew, replaced with a breaker panel.
“Old fuse panel blew up, leaving this homeowner with no power. After contacting utilities and securing the site, we identified the issue, safely removed the damaged fuse panel, and installed a brand new breaker panel.”
EV charger and panel reviews
Charger to pole. Their words.
“Lot of work got done by Dunne Power at my place from EV charger installation, panel upgrade to electric pole installation. Tom is very responsive and dependable. Would highly recommend!”
Rohan S.Google review, September 2026
“We needed to upgrade our panel and contacted 3 contractors for estimates. We were very impressed with the professionalism of Dunne’s representative, Tom. He assessed the situation and provided a detailed estimate so we chose Dunne’s.”
Kevin W.Google review, August 2026
“They installed a new Generac system and did a remarkable job. Dunne was the prime vendor who co-ordinated and managed all the players involved such as the gas professional and Hydro One to name a few.”
Ron J.Google review, August 2026
Get a quote on an EV charger
Any job. Consider it Dunne.
Tell us where you park, and the charger you have or are thinking about. The office will get back to you.
Call 519-373-2543Emergency? Call, do not fill in a form.
Get a quote
Tell us about the job. Tom or Elaina will get back to you.
How an EV charger install works and what it costs
Four steps. One crew.
- 01
You call
Where you park, and the charger you have.
- 02
We look at the panel
Room for the charger, or upgraded first.
- 03
One crew installs
The circuit, the run, the unit on the wall.
- 04
Tested and left working
Every job gets the permit and the inspection.
What decides the price
- How far the charger is from the panel
- A finished space or an open basement
- Whether the panel has room
- Whether the meter needs work
- Whether anything has to be dug
- What is under the ground
We are not going to put a number on this page that we would have to take back when we see your panel. We look at your panel and where you park, then you get the number.
“Dunne power from the moment I called was professional, transparent about pricing, fair and provided exceptional work.”
Meggy W.Google review, August 2026
Call 519-373-2543Questions
EV charger permits and panels, answered
Anything else, call 519-373-2543 or use the quote form.
Do I need a permit to install an EV charger in Ontario?
Yes. The Electrical Safety Authority requires an electrical permit for every EV charger installation, filed before the work starts. When the work is finished and accepted as compliant with the Ontario Electrical Safety Code, a Licensed Electrical Contractor gives you the ESA Certificate of Acceptance.
Do I need a 200 amp panel for an EV charger?
Not automatically. ESA’s rule is that the panel has to be able to handle the extra load, and that your local utility has to be contacted if the panel needs upgrading. What decides it is what is in your panel now, how many spaces are free, and what the rest of the house already pulls. That is the first thing we look at.
Who installs EV chargers in Grey Bruce?
A Licensed Electrical Contractor with an ECRA/ESA licence. ESA’s rule is that if you hire someone to do electrical work in your home, by law it has to be one. We are one, we are in Owen Sound, and we cover Tobermory to Walkerton.
Is this the same as a public charging station?
No. This is a charger at your house, shop or cottage. If you are looking for somewhere to plug in on a trip, that is a public charging station, and it is a different thing.
EV chargers, Tobermory to Walkerton
- Owen Sound
- Meaford
- Chatsworth
- Sauble Beach
- Port Elgin
- Southampton
- Tobermory
- Cape Croker
- Chesley
- Durham
- Hanover
- Walkerton
The Dundalk job on this page is outside that list. Not on the list? Call 519-373-2543 and ask.
Dunne Power, 786 8th St E, Owen Sound, ON N4K 1L9
Mon to Sat 6am to 10pm, Sun 9am to 5pm